In 1999, after the war in Kosovo, new developments took place affecting the electrical infrastructure, the same as other infrastructures in Kosovo. Households began to concentrate in the city and its suburb areas. This situation led to an increased demand for electric energy supply. On the other hand, the existing network was not designed to respond to such a flux of increased of customers.
This Capstone Project addresses an important problem regarding the power quality which is very common in Kosovo. It describes the context of power quality in distribution systems and deals more specifically with the corresponding diagnostics and implementation. It develops a precise and effective technique and method for the analysis how to improve a quality of electrical energy in Kosovo. The challenge of this project was to upgrade the existing design of network, and bring and build a new design of distribution system electric energy in Prishtina, saving energy which is being lost in distribution networks and improve the stability of particularly the electrical energy in Prishtina area.
This project involves technical and managerial prospects for solving the problems which are facing KEK employees and the customers in northern Prishtina. Moreover, the project provides experiences from other countries for making comparison with those in Kosovo.
The distribution network situation during 90’s in Kosovo was as a status quo. Due to the political situation there was no interest to invest in Kosovo. This resulted in gradual deterioration of the distribution network area.
This project based on the very latest studies, on increasing the reliability of quality of power energy supply up to the last customer. This project also considers the reduction of technical losses. The main goals of this project concerns the need for increasing the high level of voltage, necessary number of lines, substations and improve low voltage networks.
If it is possible to establish a scale of human needs, giving importance to the achievements of modern time and the way of living of modern human being, then for sure the electrical energy would take one of the top positions.
TABLE OF CONTENT
1. ABSTRACT
2. OVERVIEW
2.1. Energy technical losses in Kosovo
2.2. Energy technical losses in Europe
2.3. Northern Prishtina as a study case
2.3.1. Middle voltage network in SS 110/10(20)kV Prishtina 5
2.3.2. Low Voltage Network in northern Prishtina
2.3.3. SS 35/10kV Besia
3. QUALITY STANDARDS
3.1. Voltage quality regulation in Europe
3.2. Voltage quality regulation in Kosovo
3.3. Technical losses and drop voltages in Northern Prishtina as a study case
4. PREPARATION OF PROJECT AND CONTRACTS
4.1. Simulations with Gredos and Power Factory software
4.2. Data collections
4.3. Contractual arrangements
5. POTENTIAL TECHNICAL DESIGN OPTIONS
5.1. Improve stability in middle voltage network – provide the transition from level of voltage 10kV into 20kV
5.1.1. Upgrade the cross section of the conductors and built lines for reserve supply
5.1.2. Transition from voltage level 10kV into 20kV.
5.2.Improve stability in LVN
5.2.1. Establishing phase symmetry
5.2.2. Rehabilitation of LVN
5.2.3. New SS 20/0.4kV
5.2.4. Compensation of the reactive energy
5.3. Besia SS 35/10kV
5.4. Summary of chapter 5 - priorities
6. DISTRIBUTION MANAGEMENT RESOURCES
6.1. Project supports
6.2. Managerial approaches
6.3. Human Resources and Team Selection
6.4. Training Needs and Security Procedures
6.5. Communication with Internal and External stakeholders
7. RISK MANAGEMENT PLANNING AND BUDGET ESTIMATES
7.1. Identify and mitigate risks
7.1.1. Strengths
7.1.2. Weaknesses
7.1.3. Opportunities
7.1.4. Threats
7.2. Budgeting and cost estimation
8. DESIGN THE EVALUATION OF THE PROJECT
8.1. Determining cost benefit
8.2. Social benefits
8.3. Environmental protection
8.4. Growing interests of businesses
9. DISCUSSIONS, FUTURE WORKS AND RECOMMENDATIONS
9.1. Technical Future Works
9.2. Financial Future Considerations
9.3. Northern Prishtina Recommendations
9.4. Activities in Long Term Plans
9.5. Future Project Selection Criteria
9.6. Recommendations Having Highest Priorities
9.7. Summary
10. References
11. Annexes
- Quote paper
- MSc. Lutfije Dervishi (Author), 2010, Improve Stability Operations in Kosovo´s Electrical Energy Distribution Network, Munich, GRIN Verlag, https://www.grin.com/document/209722
-
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X. -
Upload your own papers! Earn money and win an iPhone X.